cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

We are working to address an issue with subscription email notifications. In the meantime, be sure to check your favorite boards for new topics.

Manage Substitute Parts

李_9533764
1-Newbie

Manage Substitute Parts

I am using Windchill MPMLink Release 12.0 and Datecode with CPS 12.0.0.0

 

Manage usage of replacement parts: Assume there is now a PBOM that uses 60015664 (with replacements: 60015665 and 60015666). ①Can the BOM quantity of 60015665 and 60015666 be different from 60015664? ②If 60015665 needs to be activated (use 60015664 and 60015666 as replacements), how should it be operated on the PLM side?

 

Translated by the Community Moderation using Google Translate
-----------------------------------------------------------------------------------------------

管理替换部件的用法: 假设现在有一个PBOM,使用的是60015664(有替代件:60015665和60015666)。①60015665和60015666的BOM数量可以和60015664不一样吗?②如果需要启用60015665(将60015664和60015666作为替代件),在PLM端,应如何操作?

1 REPLY 1
avillanueva
22-Sapphire II
(To:李_9533764)

While I have seen in the database the ability for replacements to have differing quantity in the database, generally speaking, it makes sense to have them the same. But just found this setting. Give it a shot and see what it does:

https://support.ptc.com/help/wnc/r12.0.2.0/en/#page/Windchill_Help_Center%2FSiteAdminChp_BestPracticeEnableDisplayQuantUnitRefDesigAttrOnSubPart.html

 

Top Tags