PSI for Oracle configuration is hung
I am building a test system for my Windchill upgrade to 12.0.2.6.
Install Oracle 19c.
Run the 12.0.2.6 PSI Setup to configure Oracle.
It has been running for almost 20 hours and is stuck at 19% complete.
I can see the database files have been created.
SQLDeveloper shows the database. SQLPlus allows me to login in.
I have 2 options:
1) Is it safe to just kill the PSI process and keep going with the upgrade on the Windchill server.
2) Kill the process and start over with a clean Oracle install and then rerun the PSI Setup.

