Baseline information for use on drawings.
We are creating baselines in Windchill upon check-in of our different revisions once the change orders are released in our data management system. Is there a way to capture the name of the baseline (we have a specific naming convention) parametrically and add it to our drawing formats? Right now I'm using the parameter: "PTC_WM_VERSION" for both the drawing and the model that was active when the format was placed. I thing the baseline would be good as an addition or a replacement for that.
Is this a parameter that can be used, or is the baseline name just a text string that can't be accessed in this fashion?
Thanks!

