Mathcad Prime 8.0 Formatting to Word
Hey all,
I am a structural engineer, specifically in the facade industry working with the exterior of buildings such as hospitals, labs, schools, high rise commercial and residential buildings. Our team has been using Mathcad 15 for 10+ years and sadly now moving over to Prime 8.0 and are at roadblock when it comes to integrating our mathcad calculations within Word in an efficient manner.
Our process with 15 involved creating a macro in Word so that you can paste special a bitmap and so our mathcad pages are formatted to fit exactly in our report template in word to fit the margins perfectly without distorting or blurring the text (if you try pasting something larger than the margins, scaling can begin to affect the visual/readability of the calcs).
Unfortunately, in Prime 8.0 this same copy paste function doesn't produce a paste as bitmap option but only paste as Formatted Text (RTF). You CAN paste the content of the sheet but not as a big object or picture but individual text and small pictures of calculations so calculations or text can get pushed off to the next pages which just results in double the formatting time: time spent formatting a mathcad sheet and then again in word. The other option for us is to print to PDF and then snipping the pages into word from there but this is an extra step that can cause scaling issues and not the best readability + this doesn't allow for quick solves of even simple typos in text because you have to go back into mathcad, print, and then copy paste all over again. I know this sounds trivial but if it takes 15 seconds to fix a typo and get it back into a word document using Mathcad 15 and conversely on Prime 8.0 it could take up to 45 seconds to 1 minute-- this is inefficiency is frustrating when in the middle of 600-page report and in my opinion disturbs the work momentum.
I am curious if there are others out there that have similar issues with Prime 8.0 and if you found a better process/ solution / work around. Genuinely interested in how others create calculation reports using Prime 8.0 so open to all suggestions and recommendations.
Thanks in advance everyone!

