Skip to main content
1-Visitor
November 4, 2016
Solved

Traceability problem between two different nodes

  • November 4, 2016
  • 1 reply
  • 1488 views

Hi,

I have a traceability problem.

So, I have two segments: SM Custumer Input Document and SM Requirement Document; this segments are rispectively made of these two nodes: SM Customer Input and SM Requirement.

These nodes have a 'Decomposed To' relationship, but when I try to trace SM Customer Input to SM Requirent the message below appears and the traceabily isn't allowed.

Operation status:

Application does not know how to trace between "<SM Customer Input,Imported Requirement>" and "<SM Requirement,Functional Requirement>" for items 6926 and 6922


Do you have any idea how I solved my problem?

    Best answer by VolkerEckardt

    Hi Alessandro,

    the drag drop functionality you are using is defined in the MKS Solution Type, and in there in the properties.

    Go to Admin, open type "MKS Solution" and look for properties with name "trace" in it.

    This configuration has to be in line with your type names and categories.

    Does this help?

    Volker

    1 reply

    17-Peridot
    November 4, 2016

    Hi Alessandro,

    the drag drop functionality you are using is defined in the MKS Solution Type, and in there in the properties.

    Go to Admin, open type "MKS Solution" and look for properties with name "trace" in it.

    This configuration has to be in line with your type names and categories.

    Does this help?

    Volker

    ailgrande1-VisitorAuthor
    1-Visitor
    November 4, 2016

    Thank you! I have solved my problem.