Question
Adding views to a subart of Inseparable assembly
- If you modify a part within an inseparable assembly, the modification state of the inseparable master is also updated. If you store the recently modified parts of an inseparable assembly using Save Modified, the whole assembly is stored.
The modification is done by adding an additional view. As a consequence all views of the inseparable and the sheet gets the state “update needed”.
This behavior, in some situations, is not the best, because to update assembly views may require several minutes

