1-Visitor
September 7, 2023
Question
Cycle mistake
- September 7, 2023
- 2 replies
- 973 views
Hello Everybody!
I am somewhat new to Mathcad programing but I have faced with the task which required cycles in MathCAD to be solved.
The task:
i have a set of functions with the common function variable (tetta), which is defined in the interval (0-360) with the step =1. And also I have a criterion, I need to crete a cycle which calculates my functions with variable (tetta) from 0 - 360 and the compare all function result with criterion. If it meets criterion conditions the stop calculations and return Pmud. If it does not meet criterion condition do calculation with new Pmud = Pmud + 0.01.
See the attached mathcad v14 file with comments.
Thanks in advance for your comments!

