Shifts
Hello, I'm trying to work with the planned operation time. At this plant, it is a three shift system and first shift starts at 7 am. Is there a way to work with the planned production time clock without upsetting it's need to be within one calendar day? Right now when I say something like 7am and set the duration to 23:59, it will not let me.
Also, I'm not 100% sure how the OEE quality and performance math works. Because of shifts, we reset out parts count at the end of every shift, so there will be three drops to zero in any production day. Will this be alright for the calculator?
Thanks