As Stored vs the Latest Promotion Request
Hi there!
Consider the following scenario: we have a Drawing at version 0.0 and an Assembly at version 0.2.
When you create a promotion request for a drawing, a new representation of it is automatically created with using default property of EPM configuration specifications, usually it's either As Stored or Latest.
So let's see pros and cons, which I noticed:
If we select the "As Stored" option, we are faced with the problem that the drawing is no longer up-to-date because it uses previous iterations of the parts and assemblies, as well as their life cycle state, etc.
In case of using the “latest”, if some part of the assembly has been changed, the assembly may be regenerated with errors and as a result the drawing will not be published.
So, this left me perplexed, which option is the best?
Does someone have any experience of using these different properties, their other pros and cons?
Or maybe you know how to handle with both of these situations?
Thanks in advance!