Question
Can Revision "A" file be changed to Numerical revision without loosing changes made in assembly and drawing?
I have an assembly revised to Revision A and did many changes on assembly to reflect on drawing. Now I need Rev A file to be in numerical revision without loosing any changes made in Rev A assembly and drawing. Is it possible to do this in windchill?
Please do not suggest to take a backup and delete Rev A from windchill and overwrite it to next numerical revision.
(Assembly has 1000+ parts in it).
Thank you.