Cancelled Revision
Sorry new Windchill user here. I am trying to understand how Windchill works and have a question on Cancelled revisions.
It is easiest for me to use an example to explain.
Say I have a drawing B.5 status "Released"
I revise it and the system generates the next revision C.1 with status "In Work"
This drawing is worked on through various iterations to C.7 with status" In Work" Version B.5 status is still released.
At this point this revision "C" is cancelled / postoned / abandoned for whatever reason.
I know that I could delete revision "C" but there may be some useful work done in version "C.*" and it would be useful to retain these drawings.
So is there a way / status to keep the drawing but when another change is planned for drawing B.5 the revise function can be done and starts with revision D.1?
Is there a status I could set C.7? Like Cancelled or Abandoned?
Many Thanks
Ian