Skip to main content
13-Aquamarine
August 28, 2019
Question

Creating New Variant option for all levels in the BOM

  • August 28, 2019
  • 0 replies
  • 769 views

Working with O&V, when a new variant is generated from overloaded structure, if a variant exist in the system with the same options, the existing part is getting selected by default at children level. 

 

We require an option to select whether it should create a new part or reuse the existing part at different levels. 

If this option exists already, kindly update us.