Document Revision in Windchill
Good day
I am new to Windchill and I am trying to synchronize my Windchill Revision numbers with the Documents.
Let me give an example scenario below.
1) Create New Document from local file - A.1
2) Document is edited by user until complete and checked in / replace content - A.2
3) Final draft of document is ready for review and approval, saved as pdf for review and signature. Document Checked in - A.3 and pdf sent out for Review and signature as A.3.
4) 2 weeks later pdf is returned (reviewed, approved and signed as A.3)
5) When i check it in as attachment to Document A.3 it then becomes A.4 but it is not A.4 it is A.3 Signed.
What tips does anyone have to add attachments etc without changing the revision.?