Skip to main content
1-Visitor
September 14, 2015
Question

PDM drawing status change

  • September 14, 2015
  • 1 reply
  • 934 views

Is it possible to change status of the drawing from 40 to 10 in PDM without changing revision?

1 reply

23-Emerald III
September 14, 2015

Are those lifecycle levels for your company?

We use draft, design, prototype, released and obsolete.

The drawing status can be changed if you have the proper permissions. See your PDM administrator for help.