Revision for new object
We have our revision sequencing that starts at A and goes through Y for pre-release documents and then can jump at anytime during the alpha phase to numeric revisions starting at 0. In some cases we need to define the initial revision when we load a document into Windchill to be at revision 0. Currently we do it the back wood method of revising the revision A document to revision ) and then do the promotion request. This leaves us with a revision A document that does not really exist.
Is there a modification to the OIR that can be used to select the initial revision from the revision table or at least ask for the revision to be entered?
We are on Windchill 11.0 m030 CPS08.