Set Revision Level?
Windchill PDMLink 9.1 with Pro/Engineer WF4:
Is there a way to set a revision level for a CAD document other than "Creating a Revision?"
Much of our migrated data (from Intralink) revisions are incorrect and need to be adjusted (most of them multiple revisions forward, but some of them backward). I've seen macros or permissions in other softwares that allow an admin to "set" the revision level of a line item, similar to how it is possible to "Set State" in PDMLink.
Can this be done with revisions, even if it is some kind of "back door macro?"

