Skip to main content
23-Emerald III
July 24, 2017
Solved

Upgrade from Ooracle 11g to 12c

I am working on an upgrade from Windchill10.0 mo40 running on Oracle 11g

I would like to upgrade to Windchill 11.0 m030 running on Oracle 12c.

 

Do I need to do anyjthing special to do this or will the Upgrade Manager handle all of the updates to Windchill and the Oracle schema?

 

1-Visitor
July 24, 2017

WinDU tasks for 10.2 is enough.
I upgraded system from 10.1 to 11.0 there the WinDU tasks also only for 10.2.
You must use export/import dump procedurу for oracle.

3 replies

1-Visitor
July 24, 2017

You need to run WinDU tasks for Upgrade preparation.
Export/import oracle database to dump file.

Translate
BenLoosli23-Emerald IIIAuthor
23-Emerald III
July 24, 2017

That is a problem with the way PTC has mishandled WinDU!

I have run WinDU for the 10.2 upgrade, but PTC did not release WinDU patches for a 10.0 to 11.0 upgrade.

All of the Upgrade for 10.2 WinDU checks come back with no errors and a few warnings. A complete WinDU run does the same.

 

That is my plan for the database, export from the 11g and import to 12c, then run Upgrade Manager.

Translate
1-Visitor
July 24, 2017

WinDU tasks for 10.2 is enough.
I upgraded system from 10.1 to 11.0 there the WinDU tasks also only for 10.2.
You must use export/import dump procedurу for oracle.

Translate