WC 10.2 Baseline collection problems

  • July 25, 2017
  • 6 replies
  • 4162 views

So, I have a couple of baselines of a CAD Doc structure that were taken just prior new revisions of many objects being created (new revs were created the same day, about two hours after the baselines were created). When going back and looking at the baseline after, the baselines are showing the new versions of the revised CAD Docs.

 

Anyone familiar with baselines care to guess what we might have done wrong?

 

6 replies

19-Tanzanite
July 25, 2017

Were the baselines locked once they were created?  Did someone modify the baseline after the revision change?  Did you look at the last modify time of the baseline?

dguidry2-ExplorerAuthor
2-Explorer
July 25, 2017

The baselines were not locked, no one modified the baselines, and the baseline was showing last modified at creation time. Unluckily, I have modified it (I had to remove and add some upcated objects, which is why I was looking at it).

 

Do baselines automatically update to latest revision/iteration if not locked?

17-Peridot
July 26, 2017

They do not automatically update.  If you updated some items using the collector it is possible that you got the new versions that way into your Baseline.  Or someone could have selected the Baseline to update when they checked in their data which would also do this.