What the best practice for document to document links?
Can someone please tell me what the best practice for document links are?
Say I have a manufacturing process instruction that references multiple tools in the build procedure. I create a “References Documents” link in my manufacturing instruction Document, to the Tool Documents. Now the one of the Tool Document revises. Am I supposed to revise every manufacturing instruction document that references that tool document in its’ procedure?
In my case, I don’t care if that Tool revises, my manufacturing process document still uses it.
Please advise.
