Skip to main content
3-Newcomer
Oct 22, 2026 4:13 PM UTC
Question

Why Workgroup Manager is needed for SolidWorks still on Windchill 13.1.2.0

I am using Windchill PDMLink Release 13.1 and Datecode with CPS 13.1.2.0 Why Workgroup Manager is needed for Solidworks? As observed Creo don't need the WGM any longer. Impact is with WGM it takes a lot of time, without WGM it is significantly faster for big assemblies. If we can have a quick call with PDMLink and CAD integration team to answer the follow up question it will be great. This is not urgent.

3 replies

StephenW
23-Emerald III
Oct 22, 2026 4:49 PM UTC

This is worded like a support query but you have posted this to the PTC community.

You may get community responses that help.

Translate
23-Emerald III
Oct 22, 2026 7:10 PM UTC

The interface (WGM) between Creo and WIndchill is built into WIndchill. The WGM handles the file types that SolidWorks uses and allows them to be lined within WIndchill.

A Work Group Manager is required for ALL CAD systems that interface with Windchill, just the Creo one is imbedded in the code. 

Translate
avillanueva
23-Emerald II
Oct 23, 2026 1:22 PM UTC

​@BenLoosli is right but think about what you are asking. CAD integration are very specialized to read CAD files, understand relationships, dependencies, parameters, etc. The WGM works basically the same with all supported CAD packages. The UI is actually similar to Creo Parametric’s workspace. Fundamentally, they operate the same. But since PTC cannot write code into each vendors UI, you need a layer of abstraction.  Hope this helps. What are your follow up questions?

Translate