Revise and Promote combined
Hi, I am attempting to match what we do in windchill to our business process.
At development and prototype states the revisions should be Numeric. Once the objects are promoted to pre-production or production the revisions should become Alpha. I have configured for state based versioning and all looks quite positive so far, I then noticed that when i promote to pre-production from the earlier state the revision remains at Numeric until the item is revised. Also if I promote to Production without revising in pre-production this will also appear as Numeric rev until a revise has been done.
Is there a method I can use that will promote and change the revision scheme in one step?

