Question
Sequence CN with subsequent CN's
Hello Everyone,
Looking for some direction. Current company is using engineering CR to CN with Change Tasks (sequenced) with a downstream manufacturing CN (mCN). The task to create the mCN is within the template of the engineering Change Notice tasks.
Question. Is there a way to systematically sequence CN’s?
Assume we can have a CT template to create another CN. A task could be created in the CN workflow to create the downstream CN’s. But the sequence of then the CN’s move forward is missing with those options.