Skip to main content
1-Visitor
June 20, 2017
Question

how to create the coordinate system for assembly in jlink coding

  • June 20, 2017
  • 4 replies
  • 2163 views

can anyone tell me????

4 replies

15-Moonstone
June 20, 2017

Can you specify your problem ? Tell us more.

vdayalan1-VisitorAuthor
1-Visitor
June 20, 2017

I need to create the  datum coordinate for components (fix constraints part) and I need to change the constraints automatically through this particular comoonent created coordinate and assembly default coordinate. jlink coding

15-Moonstone
June 21, 2017

How the coor sys should be created ? On existing geometry or predefined reference or .. ?

vdayalan1-VisitorAuthor
1-Visitor
June 21, 2017

new coordinate system should be created on the particular part (only that the part is fix)....