Skip to main content
1-Visitor
November 24, 2011
Solved

Reduce plot resolution to win time

  • November 24, 2011
  • 2 replies
  • 3152 views

I want to plot an integral with one of the boundaries on the x-axis. The problem is, it takes several minutes.

Can I set a lower resolution of the plot to speed it up?

Best answer by ValeryOchkov

One solution (yellow operator) in attach.

2 replies

1-Visitor
November 24, 2011

Please show mathcad worksheet.

1-Visitor
November 24, 2011

It is calculating the required length of a sheet pile wall.

The problem is the last plot.

24-Ruby IV
November 24, 2011

One solution (yellow operator) in attach.

1-Visitor
November 24, 2011

Perfect, thanks!

1-Visitor
November 24, 2011

Very interesting ways of calculating the required pile length. I tend to do it a little different.

Do you follow a specific method?

Mike