Intralink 3 - Release Scheme timing
Cast your mind back many years, to when the Internet was new, cars had things called 'carburettors' and mobile telephones were the size of a small suitcase. That's right, when Pro/Intralink 3.4 was the latest & greatest.
We are still Intralink 3 users here, and we are looking at implementing a different release scheme.
I have a question that you may be able to advise me on:
In the process of an Engineering Change, the object (part, assembly and/or drawing) must be demoted to in work and its Revision must be changed to the next one (from 2 to 3, for example).
Given that our drawing format displays, clearly, the Revision and Version of both model and drawing, which of the following is the best course of action and why?
1. The engineer demotes the object to In Work, Changes the Revision, does the Engineering Change, saves the object (potentially several times) and raises anRTP form
2. The engineer demotes the object to In Work, does the Engineering Change, saves the object (potentially several times), Changes the Revision, and raises an RTP form
The difference is in when, during the process, the Revision is changed - before the changes are done or after.
I would welcome your thoughts.
Thanks,
John