Reconcile Design and Manufacturing BOM
Is there a good way to 'reconcile' the design BOM and the Manufacturing BOM in Windchill PDMLink? The senario is: A designer makes a new design with new structural components, but the hardware (nuts and bolts) is the same as another. Our MBOM will have the hardware 'boxed' for shipping. The MBOM creator pulls in an existing hardware box part with some hardware in it. Is there a way to 'subtract' the hardware contained in the box from the BOM so the creator can see if it correctly fullfills the need?
The current product structure explorer functionality (we are on 9.1) seems to have good processes for making all new structures where you will drag components into new levels and create new parts for them, but I get lost on how to manage pulling in existing parts and ensuring the underlying components get accounted for. We like to reuse as many production SKUs as possible to minimize inventory control issues and WIP in distribution.
Maybe I am out in left field on this...do any of you run into this senario and manage it well?
Jon

