Skip to main content
1-Visitor
January 5, 2010
Question

Intralink revision in ProE drawings

  • January 5, 2010
  • 1 reply
  • 639 views
Is it possible to modify the Intralink parameter proi_revision from within
pro/e?









--



Lyle Beidler
MGS Inc
178 Muddy Creek Church Rd
Denver PA 17517
717-336-7528
Fax 717-336-0514
<">mailto:-> -
<">http://www.mgsincorporated.com>
This thread is inactive and closed by the PTC Community Management Team. If you would like to provide a reply and re-open this thread, please notify the moderator and reference the thread. You may also use "Start a topic" button to ask a new question. Please be sure to include what version of the PTC product you are using so another community member knowledgeable about your version may be able to assist.

1 reply

1-Visitor
January 5, 2010
Yes you could remove the text line that uses "&proi_rev" , but the intention is not to do that. You want to remove the human error that could exist when you have a drawing and PDM system that don't match on revisions. If I was the admin at your location and someone needed to change the revision on the drawing I would have them discuss this with me before making any changes.

Eric Mills

Design and Project manager

http://www.rapidoconsulting.com

eric.mills@rapidoconsulting.com