Question

WIndchill 9.1 M060 to M070 and Creo Parametric 2

  • June 27, 2013
  • 2 replies
  • 696 views

We are hoping to upgrade to Creo Parametric 2 soon.


We are currently using Creo Element Pro 5 M150 with Windchill Intralink 9.1 M060, with 2 replica sites.


(Using Oracle 11g R1 11.1.0.6.0 which was supplied by PTC with Intralink)


I would like to keep the Windchill upgrade simple.


Apparenlty, I only need to upgrade to 9.1 M070, and the Oracle gets upgraded to R2 11.2.0.3.0.


(Not interested in Windchill 10.x at this time, which requires a migration)



I tested a dummy upgrade in a test environment, by simply instaliing M06 followed by M070, which worked fine.
But I have not tried to clone my production server(s) and upgrade the clone.
So, I do not know how much the database contents will get updated in the process.



Has anyone gone through a similar upgrade and had any problems/concerns that they can shared?



Gerry Champoux
Williams International
Walled Lake, MI

2 replies

June 27, 2013

Thanks to Bob who pointed out that the

23-Emerald III
June 27, 2013
That is a recent change.