Recently active
Storyboard describing best practices and a typical development process that can be used to apply Model Based System Engineering (MBSE) using Windchill Modeler.
Hey everyone! I am new to Integrity and SySim and trying to run the SySim model "Speed_Controller" from the Integrity Examples file. Whenever I click "Make Model Executable And Run", I get the error message "Unable to find/load Visual Studio project". I attached a screenshot of the preparation tasks window. Strangely, after the error message occurs, there is indeed a Speed_Controller.vbproj file in the correct directory and it even has code in it. I followed all the steps in the ReadMe file in "Speed Controller" (see attached image) though I don't have the option '->SySim->Artisan Studio SySim' but only '->SySim->PTC Integrity Modeler SySim'. Manually creating a .vbproj file doesn't change anything. I'm using Visual Studio 19 and Integrity Modeller 9.2.0.16. If you need any more information, just ask. I'm thankful for every response 🙂 Kind regards, Leon
Hello All, Happy to announce that Windchill Requirements, Validation & Source 12.5 is now available for download on the PTC Download site. Key Highlights of the Windchill RV&S 12.5 Relationship Viewer Easily understand Relationship Status Navigate to Items, Document or Relationship Views Manage the view Columns Filter the results in Relationships View DocStudio Create Branches, Versions, Baselines Edit Parameter Values Start where you left off after opening a document again View Text in Outline Pane Now retain DocStudio Column Configurations between Sessions Columns, Column Locations, Column Width, Welcome Back Item View History Timeline View Find on Page Export specific Timelines or entire page Lineage View All Document Branches, Versions, Baselines, Labels on one tab Item Edit IBPL Constraints Parameters & Parameter Values Basic Search Search by ID or Text Export Search R
What Does this Mean? Access to the support desk (Assisted Support) is available for the first two years of the “Sustained Support” period. At the end of this period the primary resources for assistance are provided through online and self-help Technical Support Services Sustained Support continues to provide access to pre-existing maintenance releases and patches, as well as New Releases of PTC Software. The Sustained Support period does not provide Customers access to new patches or new SPR fixes. PTC Sustained Support is not applicable for PTC Cloud Customers. When is this Happening? For ILM 10.8 access to the support desk ends in September of 2021. How Do I get Support? For assistance it is recommended that self-help online resources are accessed such as documentation and this community Can I purchase Extended Support? “Extended Support” is not available for the SSE family of products at this time. What if I have Question
What Does this Mean? With the end of Standard Support – applicable products will no longer be available for new patches, SPR fixes or R&D support when troubleshooting cases. PTC products are in the Standard Support period starting from the first Customer ship date (FCS). Standard Support refers to the period during which active GOLD or GOLDplus Customers can submit Technical Support cases, have access to Software Performance Report (“SPR”) fixes via maintenance releases, have access to critical patch sets and have access to new versions of PTC software for the products for which they are entitled to Support. Each product in the PTC Product Release Calendar specifies when the Standard Support period ends When is this Happening? For Integrity Modeler standard support ends in October of 2021. Can I Still Open Support Cases? YES! For an additional two years customers will continue to have access to the support desk. At the expirati
What Does this Mean? With the end of Standard Support – applicable products will no longer be available for new patches, SPR fixes or R&D support when troubleshooting cases. PTC products are in the Standard Support period starting from the first Customer ship date (FCS). Standard Support refers to the period during which active GOLD or GOLDplus Customers can submit Technical Support cases, have access to Software Performance Report (“SPR”) fixes via maintenance releases, have access to critical patch sets and have access to new versions of PTC software for the products for which they are entitled to Support. Each product in the PTC Product Release Calendar specifies when the Standard Support period ends. When is this Happening? For both 12.2.0.0 and 12.2.1 standard support ends in July of 2021. Can I Still Open Support Cases? YES! For an additional two years customers will continue to have access to the support desk. At the exp
I tried to use the "mks.ci.server.engine.LocalTriggerManager.ScriptQueryBean" class in a test JSP page runnig on the Server Public_Html folder (Integrity 10.8). ScriptServerBean ssb = new ScriptServerBean(defaultUserID, conn, sig); String[] projects = ssb.getProjects(); // getting Error with This ScriptQueryBean sqb = ssb.getQuery("Query01"); Ther are no error happend if i used a method that returned a " java.lang.String[] " (ex. getDynamicGroups(), getProjects(), getNotifierAddress(), ..), but if i use onther method (ex. getQuery("QUERY_NAME") ) i got the following Error: ERROR [org.apache.catalina.core.ContainerBase.[jboss.web].[localhost].[/].[jsp]] Servlet.service() for servlet jsp threw exception mks.frame.triggers.TriggerException at mks.ci.server.engine.LocalTriggerManager$ScriptServerBean.getQuery(LocalTriggerManager.java:3759) at org.apache.jsp.reports.test11_jsp._jspService(test11_jsp.java:76) at org.apache.jasper.runtime.HttpJspBase.service(HttpJspBase.j
From my knowledge it is possible via the commands to check out/check in: si createsandbox si co (check out) and si ci (check in) the question I have is if it's possible to do this even without creating the sandbox before. So like it is done on web interface where you can work directly inside the project without a sandbox
I try to add multi-line "work description" using command line interface?Similar to the follwong:im editissue --field="Work Description"="Hello\nThank"?It seems to me that \n does not create and line feed.Also can we add file from content in a file?Thank you
How to export Document in ReqIF with Item traceability via IRC ? I would like to export Requirements which are related to Item types like CR/Tasks/Defect etc. Traceability like Spawns/Covered etc.
Hi Experts, We are currently challenged with the below attached use case as it is at this point a manual task. Any suggestions or ideas are welcome:) Expected Results: Should be able to see whole BoM structure (similar to Design BoM) released to Global Plant in ERP system (refer below attachment). Should be able to see BoM structure released to specific plants with only necessary Part Substitute picked in ERP system (refer below attachment). To follow Digital Thread/Traceability, how to make sure that the correct Part Substitute can be assigned when building Process Plan from M-BoM. Is it a possibility to use Alternate BoM approach? If Yes, then how to have the structure created which fulfils below expected results? Looking forward to get wiser with the recommendations/ideas shared. Thank you in advance. Stay Safe...!!! Regards, Praveen
Is there a way to import excel files into a document, using Integrity 11.2. We are looking for a feature that would allow creation of new line items and update any existing line items, if the Item ID matches
Hello,This error does not happen often but I need to give a return to the user.In this case, when the user attempted to change the text (without using copy / paste) from Content below, he received the message:system clipboard data unavailable.The change could not be made even by finalizing and restarting the Integrity Client.The only way was to boot the user's computer.Regards.
Hi,We are using Integrity 10.3 with FSA. When main server down, all the proxy server (Integrity service) going to down state. We want all the FSA proxy server should be be in start state even though Main server is down.Kindly guide us.RegardsSarath
Most of the assignment triggers in our environment that are meant to clear/blank out a rich-text field are configured to a value like "<!-- MKS HTML -->&#160;". Not sure why the consultants put it in there. Is this necessary? Why not just clear it to a blank value? Reached out to PTC Support, but nothing helpful so far.
I have tried to setup a C# project with referenced to ENT6Lib. But it will always raise an error that the COM classes for ENT6Lib.CCaseProjects not registered. System.Runtime.InteropServices.COMException: 'Retrieving the COM class factory for component with CLSID {594B0CA2-7610-11D1-BA96-444553540000} failed due to the following error: 80040154 Class not registered (0x80040154 (REGDB_E_CLASSNOTREG)).' I have install the Modeler with the option client only. What else need I prepare to fix the problem? Thanks!
Unfortunately I forgot to checkpoint my project. Now I have about 30 change packages with several released software versions within. How get I get the source code of those releases? Is there a possibility to download the content of a change package? Or even better to download a sandbox after e.g. the first 4 change packages?
Is there a way to globally search and replace strings across documents. I have about 300 parameters that now have to be slightly modified in about 80 test suites. Can this be done either using the GUI or through the command line?
Dear Valued Customer, We have put up the Future Platform and Integrations support for Windchill RV&S 12.5.0.0 on PTC.com. This information will help you prepare your strategy around deployment/retirement of operating systems and windchill rv&s integrations. We would like to encourage you to take the time to visit the above link for planning your windchill rv&s 12.5 system deployments. Please note that this is a plan and forward-looking information. As this release is currently under development, some of the aspects are likely to change. We would ensure we update this space to keep you informed on those changes. For more Information Please Visit: https://www.ptc.com/en/support/refdoc
We need to query filter in a report recipe, is there a way we can implement it? Below is a piece of code: <%begindetail%> <tr><th style="background-color:#60607A;color:#FFFFFF;font-weight:bold;text-align:left">States</th><td style="background-color:#F5F5F5;text-align:center"><%compute%>('IsEmpty(Query("<QueryName><Filter needed in this query for a particular field>>",sum("<fieldName>"), 0)')<%endcompute%></td></tr>
When I try to login, I get an error regarding SQL server during my install. I'm doing a standalone install and meet all of the computer hardware/software requirements per the installation guide. HELP?
Hello, I'm seeking help to accomplish the following TASK: Incrementally transfer history records of an item from PTC Integrity to an external database. Besides that, extract only a subset of fields, contained in the history records. DESIRED APPROACH: - Get the timestamps of existing history records of the item in PTC Integrity, - Get the timestamps of the history records already stored in the external database, - Determine which timestamps from PTC Integrity are missing in the external database, - Get the missing history records from PTC Integrity one by one and store them in the external database PROBLEMS: - The only way to get the history records seems to be using an "im viewissue --showHistory" call. - Using this call, it doesn't seem to be possible to reduce the output to a subset of fields contained in the item. This leads to: - Necessity to retrieve complete history of the item, including all history records and all f
A Java application uses mksapi-jar client library and attempts to retrieve item history using "im viewissue --showHistory" calls for multiple items one by one. Running requests agains the remote server and through the local IntegrityClient shows huge difference in response times and network traffic. The table below shows response times for several items using local and remote integration points. All tests are executed from the same machine. The meanings of the columns are: - Size (M): The size of the raw XML response in MB - Local: The duration of the request if using a Local Integration Point integrationPoint = integrationPointFactory .createLocalIntegrationPoint(major, minor); - Remote: The duration of the request if using a Remote Integration Point integrationPoint = integrationPointFactory .createIntegrationPoint(host, port, secure, major, minor); - Factor: Remote / Local (rounded) Test Results: Size (M) Local Remote Factor 1 :02 :06 3 1
PROBLEM: The PTC Integrity server responds with uncompressed XML to the calls issued though the Java API client library (mksapi-jar-4.16.1413.jar). The returned XML is even pretty-printed and thus additionally increased in size. For certain calls, for example retrieval of the history for an item using "im issue --showHistory" command, this leads to significant performance and traffic penalties. For items with large history, these penalties become unacceptable. CLUES: The HTTP logging on the client side can be enabled by setting these system properties: System.setProperty("org.apache.commons.logging.Log", "org.apache.commons.logging.impl.SimpleLog");System.setProperty("org.apache.commons.logging.simplelog.showdatetime", "true");System.setProperty("org.apache.commons.logging.simplelog.log.org.apache.http.wire", "debug");System.setProperty("org.apache.commons.logging.simplelog.log.org.apache.http", "debug"); It is clear, that the client does advertise co
I have tried to edit gateway file, mapping file but unable to find any solution for import of Excel document in Integrity..Could anybody know the solution for this..?
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.