I am using a stand alone Java app to run IE tasks. (Java app based on RunTask.java example in WC 8.0 Customization using IE Tasks) I am not using a Java SOAP client. I think the issue has something to do with task delegation and using a dispatch task but have not found an example that provides a clear picture.The error:(com.ptc.core.adapter.server.impl.implResource/12) wt.util.WTException: No content input stream available. at com.ptc.core.adapter.server.impl.AddContentItemsWebjectDelegate.invoke(AddContentItemsWebjectDelegate.java:397) at com.ptc.core.adapter.server.impl.WebjectDelegateFactory.invokeDelegate(WebjectDelegateFactory.java:434) at sun.reflect.NativeMethodAccessorImpl.invoke0(Native Method) at sun.reflect.NativeMethodAccessorImpl.invoke(NativeMethodAccessorImpl.java:39) at sun.reflect.DelegatingMethodAccessorImpl.invoke(DelegatingMethodAccessorImpl.java:25) at java.lang.reflect.Method.invoke(Method.java:597) at wt.method.WTAdapterImpl.processWebject(WTAdapterImpl.java:749)
Dear All,Currently we have Windchill Projectlink which is implemented to manage the Project across the Cross Functional teams. I have populated all the activities and RACI has been done and now we have it running in a perfect conditionMy concern is:1. For every document being uploaded and added as deliverables (documents are essentially, word, excel, igs, pdf and ppt and not other data), we have to route it manually for approval or release.Is there any possible way to get it done automatically for the documents uploaded in Projectlink.Reason for asking:Sometimes the users upload the document and set the track work to 100% before getting it to approval stage. Also I would like to ask, if an activity is set as complete, but as an admin I know it is not. Is it possible to revert it back and make users to rework on it.Thanks in Advance
hello everyone i have created one activity say (submit design doc) and added user1 as owner and user2 as resource, now i am adding a deliverable to this activity and i want user2 to add deliverable , but when i add user2 as owner in deliverable , then automatically activity owner is changed to user2, how can i manage that activity owner is user1 and deliverable added by user2kindly provide the solutionthanks and regardsNimish
I would like to create Vendor / Manufacture part and associate with an existing OEM Part.I have managed to create an AML/AVL part using the APIs specified in CS181617.However, I would like to know how to associate this new Vendor part with an existing WTPart.Thanks in advance.
In the report , we can use the report calculation formula to calculate such as percentage. but we can't sort by the percentage. Our customer hope they can display failures in the report from high to low by the percentage.(one (Number of failures of assembly /Total Failures of the product).Steps to Reproduce1.Open FRACAS Design File.2.Choose 'Formulas' from 'Insert' menu, WQS FRACAS appears formula form(as figure1. in attachment).3.Edit 'Count ' and 'Percentage' calculation formulas(as figure 2. figure 3. figure 4. in attachment).4.Load the calculation formulas to the report.(as figure 5.in attachment).5.Print review the report.The result picture is shown as figure 6.
how to get timestamp of each state for ecn if we have object number ?I am new to windchill customization , please help .
We are using Creo 3.0 (M120) and I wanted to know where the option is to change the Check Out option when I add something to my workspaces. The option is set as default to NONE, but we want to change it to INITIALLY SELECTED, but cannot seem to find exactly where the option is. We've changed a few options in the Preference Manager but either we're changing the incorrect options or are doing so incorrectly.
HiMr. KimWorking at the R&D center of compressor manufacturer.We purchase the Windchill Quality Solutions 10.1(Reliability prediction).I have one difficulty in using the above program.I am wondering if there is any picture or geometry data to refer to when choosing general data-category, subcategory for prediction.
I have a WTPart object which is added to a Workpackage as a seed. i need to get Workpackage from this part.which link to navigate or any API available?
CAD part in 3.0 versionWTPart in 2.0 versionLikewise, I have 48 CAD & 48 WTParts from a family table with no association in the latest CAD.Is it possible to associate in bulk using the family table instances?
Documents here are pdf, word and not CAD docs.We have custom Engineering specs document template, which is a pdf and looking to have auto association created for these pdf with wt part
Hi Everyone,Is there a way for me to run a batch file (.bat) stored on the Windchill server using Workflows?I found the following PTC support document:https://support.ptc.com/appserver/cs/view/solution.jsp?n=CS165653&lang=en&source=snippetBut I've not been able to get it to work as of yet. Does the above article seem correct, or is there another method that can be used?Thanks in advance for your help!
I have a set of WTParts whose serial number effectivity value has been entered wrong. I want to delete them using API.What is the API to access the serial number effectivities associated with WTPart?I know that I can delete the serial numbers using the following API: PersistenceHelper.manager.delete((ProductSerialNumberEffectivity) serial);But I am having trouble getting the ProductSerialNumberEffectivity for a particular WTPart.Please help.Thanks in advance
Could someone please either upload or give a link to their Windchill Rehost Utility 3 or whichever is the current release?Trying to rehost from one machine to another.We have PDM Essentials and the documentation calls out to go login and go to the downloads page but it doesn't exist there. Even had a help ticket open for 2 weeks but they were never able to help.
Hello,Question to PTC : Have you any plan to make WPA reviewed by IPC ?As far as I know, WPA is not listed in previous IPC reports.(link to IPC document : https://ipc.kavi.com/kws/public/download/6079/Review process for IPC 1752A solution providers.docx)Regards,Pierre.
I am new to CREO and Windchill.We are running CREO 3.0 M090 and Windchill 11.0.Is there a setting in Windchill 11.0 that deletes all previous versions of a part once that part, Assembly or Drawing is release?
We'd like to allow the creator of a promotion request the ability to modify (add or delete) members while the request is still In Review.Is there a change that can be made under the Policy Administrator to allow this?We are currently running Windchill PDMLink 10.1 M030.Thanks in advance.
I'm working on another update to our Change Management workflows. In this new version I end up with a bunch of sub-types of WTChangeActivity2.One in particular is fairly simple. On that I'm guessing that if I set it up this way I can give these two principals the access needed (Modify, etc.) while all other Roles get only Read & Download:Before I go too far down that rabbit hole, I want to confirm that everyone listed as Principal get the expanded permissions, even when there are multiple Roles chosen as Principal. After all, nobody likes messing with this cumbersome interface for a few hours only to have to delete and start over because of an unforeseen problem.
Hello everyone,I have a need to be able to check in PDMLink if a certain set of Products (identified by product numbers and/or Product codes) that are made available in a file (excel) exist in PDMLink or not (in a certain state).We know that we have a clear mismatch in what all data has been uploaded in our system.We need to figure out exactly what all Products are missing in the system that should have been there.So, we have retrieved an excel from our ERP system consisting of all Product numbers and Product codes (These are defined as Global attributes on EPMDocument type in Windchill)It is a huge list of around 10000 products in that excel.What I am looking for is a way to be able to check whether a certain Product (identified by Product no/Product code) has an equivalent EPMDocument (in Released state) in Windchill.If any of you have encountered similar issues, I would appreciate it how you managed to handle this.Thanking in advance and looking forward to some inputs.
I am trying to direct my workflow based on what sub type the PBO is. The following syntax only works for the Parent types.if (primaryBusinessObject instanceof wt.doc.WTDocument|com.ptc.ReferenceDocument)Thanks
Hi,We have to PLM system in place and so as to maintain one system as master system.Looking for options to retrieve part number from Teamcenter and write to an attribute in Windchill Object.Any references on capabilities explored will be helpful.
How to Set Acess Policy for NC Programmer role so that they can only View the Released Design Part Documents(EPM Document) and able to Create, Modify, NC Machining File(Manufacturing File) in In Work State.?
Hallo zusammen,folgende Fragestellung an das Forum. Vorab, wir arbeiten mit Creo Direct Modeling und dem Windchill Workgroupmanager 10.2 M030-CPS18 auf dem Client und serverseitig mit CPS22.Ist es in PTC Windchill 10.2 als Admin möglich irgendwie an die Daten eines Users in seinem persönlichen Workspace zu kommen um diese Einzuchecken?Kurze Beschreibung des Falles: Ein User ist erkrankt und hat neu angelegte Daten in seinem persönlichen Workspace, diese sind zwar in den Commonspace hochgeladen und für mich als Admin ersichtlich, aber nicht eingecheckt. Nun sollte ich die Daten irgendwie "frei" bekommen, dass ein anderer User diese weiterbearbeiten kann. Neuanlage geht nicht, der Artikel ist bereits im System vorhanden und beim Einchecken bemerkt das System, dass im Commonspace eines Users Modell und Zeichnung bereits vorhanden sind, und bringt eine Fehlermeldung. Des weiteren möchten wir den aktuellen Stand nicht einfach nochmals erarbeiten. Lösungen unter Übernahme des Useraccounts mi
I am looking for a company that is currently using an APQP process managed by Windchill
Help! I need an article that helps me to find what I want to find in Windchill faster. For example: I want to find all parts that have keyword "Nut". I don't want to see all the models I just want to see the various drawings so that I can find the right size I need. However, windchill pulls up all 1500 models and exceeds the table limit and I cannot find what I need.Also, how can I make search more powerful? If I have the following library folder structure:NutsAcorn NutsFlange NutsStandard nutsStandard nuts (black plating)Screws Is there a way I can create to create parameters and search for all nuts with a 1/4-20 thread and only search in the Nuts folder? This is just an example, I understand that PTC has add-ons for fasteners, but I also want to be able other objects by parameters. For example. I have glass in different lengths and sizes. Is there a way that I can create parameters in my parts to search for all glass: tempered, wi