Windchill
Recently active
We have some legacy PR's in another tool and would like to mass create them in PDMLink.They have some data that is only used in the legacy system so when we create a new PR those attribute fields for that data are not available (so unless we change the PR object we cannot manually create legacy PR with that legacy data).
Hello all, We would like to show the name of a Change Notice in the Part structure. Right now it is showing that a "pending change exists" in the column "change status" but it would be very helpful if the name of the CN can be shown in another column. Can this be done? Best regards!Dennis Varkevisser
Hello, I want to know that how to get sequence number for WT.Part or Wt.Document in windchill through API? When I create WT.Part number automatically generated. But I can not find any method that returns the next number. I am using Info.Engine. Please help me to fix. Any suggestions would be appreciated. Thanks.!
Hello, I am looking for a way to export all the usernames in the windchill system. Ultimately the goal probably will be to import those names into an excel spreadsheet. Any suggestions?
Is it possible to export a creo part (.prt) file and or assembly (.asm) file from windchill "server A" to import the same files into "server B"?
I am using Windchill PDMLink Release 12.0 and Datecode with CPS 12.0.0.0A few questions about Windchill servers in different locations working together: 1) Can licenses purchased in different places (such as China and the United States) be connected to the same server? 2) What is the status of servers in different locations? Is it a master-slave relationship or an equal relationship? 3) Regardless of whether the servers are in a master-slave relationship or an equal relationship, can you directly switch to another server to work when a server has a problem? 4) Regardless of whether the servers are in a master-slave relationship or an equal relationship, can it be set on the respective servers that only local file data is given? Do not synchronize data with other servers. 5) Must the versions of Windchill on different servers be the same? 6) What is the recommended hardware and software configuration of the server where Windchill is installed? 7) What options are available for synchroni
The user is encountering an issue where the Actions tab is grey'd out for her as well as not having a save/complete task within the 'My Tasks' table. Within further investigation of the workflow, we appear to encounter this error prompt. "ATTENTION:The (Company Name) Document - (Document COA), (Document Name), (Library Name), 1.1 object cannot be submitted at this time. To compelte this action, you must have a submit work item for this object. You will receive this work item when the Submit task is active in the appropriate Workflow.What are the ways to solve this issue?
Example an Object has following versions : A.1 INWORKA.2 INWORKA.3 INWORKB.1 INWORKB.2 RELEASED User is able to Checkout and checkin A.3 version file as A.4. How to prevent this?
Hi Everyone, I have 100 components in a single assembly, I want to rename all the components like number, name & filename. Can we use the export from the spreadsheet for this? Actually, I tried to change the filename on this method, but I can't change the name & number. Can you help me with how we can do this?
Hi All, While creating a change task, I have to manually set the release target for the resulting object to Change: Is it possible to set it to Change by default
A straight forward way to report all part types
Is it possible to configure set state action to show different target states for different roles irrespective of life cycle template?We have requirement - User assigned to specifi role should not be able to see the "xxxxx' state under target state while performing set state action
Hi Everyone, When I check in the part into Windchill, the link drawing is not collected not only that only the part version has been changed. I found one config that only I can use in the above Creo 8 version. But how we can use it in a lower version? dm_custom_checkin_prompt set as Yes. Thanks in advance. Regards, Amir
Hi Please send updated file (for customer MEBOR d.o.o.) with Windchill licences + TXT file. Kind regards. Mojca
I am using Windchill PDMLink Release 12.0 and Datecode with CPS 12.0.2.0We need to understand how to attach a representation of a particular Part/Assembly to the Change notice- Representation will have markups and Notes explaining the changes for the partHere are the errors that I facedWe need to understand how to attach a representation of a particular Part/Assembly to the Change notice in Windchill- Representation will have markups and Notes explaining the changes for the part
How do I programatically update editType attribute on com.ptc.sis.BaseUsageLink ?
10.1 M040Hi Everyone,I have a request from the business to be able to dynamically set the email recipients within the workflow at runtime to duplicate a process that exists today (Outlook distribution lists). Is it possible, at runtime, to configure what recipient email addresses will be used for an email robot?Patrick Williams | Engineering Systems | c: 616.947.2110[cid:image001.jpg@01CFE218.FE260230]
I need to create a Report that shows a multi-level aggregated BOM. I know there is a report in the structure Tab with this function (see picture). But i need also one more attribute from the linked CAD-Document and i just see the attributes from the WTParts. Is there a way to integrate the liked CAD-Documents to the Report/WTParts that i can see them too? Or is there a way to get the QML of the Multi-Level Components List-Report that i can modify it in a customized report?
I am using Windchill Supplier Management Release 12.0 and Datecode with CPS 12.0.0.0Could you please share with us the steps for copying the latest iteration of vault data?
Promotion requests are normally controlled by specific workflow process and roles available in each context. Creating a new promotion request for objects in one context will automatically use the roles and processes from that same context. This all falls apart though when objects from multiple contexts are added to the same promotion request, especially when the promotion request is created from a search result. *ANY* context can be selected, even contexts that have nothing to do with the objects on the promotion request. In my opinion, this is a serious loophole with significant security implications. This allows the wrong workflow processes to be used, and the wrong people to grant approval, either intentionally or unintentionally. Is anyone aware of a preference or other method to prevent this behavior? I imagine something could probably be done with customization, but this really seems like it shouldn't be necessary for such a core capab
Windchill 12.1 workflow editor does not show any robots:
Hi All,I would like to know from the group, whether anybody has integrated any Message Oriented Middlewares (MOM) with Windchill. If yes, which MOM is being used?We are trying to use ActiveMQ with Windchill. Anybody has any experience with this? Or any other suggested MOMs.Please share your experiences.
Hello, Could someone explain what is the difference between delete from Windchill and delete form Windchill and directory server? I am confused which one I should opt for. Is directory server means Windchill database? could someone please explain? I have read the PTC support article but still confused. please help Br,Sandeep C
Hi, my PSI Folder got deleted, now i want to install Windchill ProjectLink how can I do that knowing that my PSI folder is deleted Regards
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.