Hi, I am facing issue with connecting with server, using centralize server for licensing. can any one face this issue before?
Which versions of Integrity Lifecycle Manager and Modeler are necessary for integration between the two?
We are constantly asked how to extend the default text field of Requirements to be able to enter rich text data easier (Without the need to run "Edit in Word").Unfortunately, there is no resizing of the text box yet.But, we can have a new field which we can put into another tab, with different sizing:Based on the nature of the Integrity Client, both text fields will be kept in sync automatically(in fact both are based on the same internal Shared Text).Field Setup:Perhaps this is something you like to try out?Keep in mind that you should check any restriction for editability related to the standard "Text" field.If there is one defined, you must apply this rule also to this new "Text Long" field. You should also check and update the Requirement Type properties.Furthermore, I was also trying to achive the same functionality for the "Description" field, which is used in Defects, Change Requests etc.Although I played with new QBR, Relationships and so on, I can't bring it to work.If y
Hi @allI want to put Image into a RichTextField using CLI (im createcontent)Thanks
I recall there was a way to produce a report that would show all the type design and linkages to other objects. How do you run that report? Thanks, Rob
Is it possible to edit group name that once created in MKS Domain Groups with Integrity admin client?Thanks in advance.
Hello Community,I have one doubt in RQ command.I tried "RQ createcontent" command in command line with the below syntax but it shows error.""RQ createcontent --type=ALM_specification --parentID=3654306 --richContentField='ALM_Text=sample' --addRelationships="Validated By:"3491362(I found the error in --addRelationships)""could you please tell me how to execute this command properly.
As far as I can tell, only a few individuals from PTC Support sometimes respond to questions. Without more active contributions from the product experts, there are lots of questions that are left unanswered or partially answered. We, clients, are left to support each other as best as we can by volunteering our time. I do contribute answers when I can, but I have never received a single answer to my own questions posted here. As a result, I end up contacting Support directly, but this is not helping our community as a whole.I think more proactive involvement from PTC is needed here.
During the Security session at a large customer of ours, one of their questions was if we’re going to introduce SHA-256 support for hash encryption for salted and hash passwords in MKS Domains since MKS Domains are here to say for a while? Today it appears that Integrity's MKS Domains still use insecure SHA-1 hash encryption...
Hello,I am in a discussion with my client how to create a small training/development environment.Obviously there are different options. Therefore, I'd like to use this forum to discuss with you which approach you suggest / you already have used in the past successfully.Option 1: Solution Export/Import to get all IM Configurations=> According to my experience this might work, but has not to. Especially when you have many users defined, this export sometimes crashes or is not installable, unfortunatelly.Supports "Source" - no, Supports "Workflow&Documents" - yesSupports "Data" - noOption 2: Stage to Empty=> If Option 1 does not work, this is the alternative. You connect an empty Integrity environment and configure "stage to empty". The beauty with this is that you can even select which configurations you like to move. Supports "Source" - noSupports "Workflow&Documents" - yesSupports "Data" - noHint: "Stage to empty" is suggested to be used when you have to build up th
I have created new workflows in which I do not want allow state change from 'development'to 'development complete' state if a change package is at rejected. i have allowed to create/submit/accept/reject/close the change package in development. When I reject the change package, user should not move other state of the workflow.
Hi,Trying to launch Integrity client - Administration . but showing the error as Error connecting to ptc-training.ptc.com:7001: The IP address of the host could not be determined. as shown in Image
We have noticed that the QUSRNOMAX Queue has 141 Jobs in it.There are only two unique Jobs in there Opt Job User Number Priority Status M30005 MWIPROD 127801 5 RLS QSCLICEV QUSER 127827 5 RLS The only difference is in the "Number" Field.Our q
I have to upgrade Intergrity 9.6 to Integrity 10.9. Therefore also MS SQLServer has to be upgraded, too (without losing any Integrity data).Especially I need to upgrade from SQLServer 2005 to SQLServer 2008 and then from SQLServer 2008 to SQLServer 2012.Does anybody have experiences in this area ?Thanks,Peter
Hi all,I need to merge all contents of one SI database to another SI database.We have tried to do this as follows: 1) Shutdown Integrity2) isutil -c cmdbbackupcreate3) si migrate --dumpToBackup /One/Project/At/A/Time/project.pj (on the source SI database)4) Get their DBA to copy the B_ tables from database One (souce database) to database Two (target database)5) si migrate --restoreFromBackup (on the target SI database))6) Purge/truncate the B_ tables in both databases (or can this be done by running isutil -c cmdbbackupcreate again?)7) Rinse and repeat for all other projectsThe problem is now that not all projects of the source SI database are visible within the traget SI database. It seems thatall projects that have a development path are not visible in the target SI database.And: the procedure described above (using "si migrate --dumpToBackup" and "si migrate --restoreFromBackup") is not supported because it has never been officially tested.Is there any other way to merge 2 SI
Hi all,we just observed a strange behaviour in Integrity Source 10.5:When checking out an older non-member-revision (working file refers to that older revision) and then performing a resynchronize, the working file is replaced with the member revision (okay) AND the lock is changed to the member revision.This does not seem to be okay.Is this already known and possibly corrected in > 10.5?Regards, Stephan
Dear Community,we would like to achieve the following.We have an Item called 'Realisation Order'. Related to this (forward) we have an Item called 'Implementation Task', this one can carry ChangePackages.We would like to show a list of all Change Packages (and Change Package entries) within the parent item. (Realisation Order).When trying this via a Query I can of course list all Tasks that have a Change Package (genericcp.si.exists).But I have no option to list the Changepackages and their IDs. Furthermore I cannot list the entries.I know how to create such an overview by using a report, but we would like to integrate this into the Item View.So basically there is 2 questions:Is there a possibility to list the ChangePackages within the 'parent item'?Is there any possibility to integrate a report into an Item Presentation Template?I am of course open for different approaches. Maybe it helps to understand our motivation. We want to allow our Integrator to have a convenient overview about
How to use Requirements management tool? Is there any study material or video for this?
HelloI am trying to get all the active project lists from MKS into XML. I tried using "im projects" but I don't know (nor I find )how to filter only active projects and then put it in XML. Thanks for your help in advance.
I started to use Jenkins to impement a nightly build process for our software components. Therefore I created a Jenkins Pipeline item that checksout, builds and checkins the build-results. The final step would be to checkpoint the complete project incl. the build result files. Is there a way to customize the checkpoint label (that consists of date and build numbers) and a way of applying the label to all members.
Has anyone seen this error message before?MKS124143: A user name with name "John Doe" already exists.I was trying to setup a new user with PTC Integrity. When he was logging in for the first time, he got a little trigger happy with the OK button, and then this message popped up. I tried to reset the user settings under the preferences of the client application, but that didn't help. I was going to uninstall the viewset and then try again. Any ideas?
When using Paste Special and checking Include Traces, it doesn't seem to actually include the traces. What is required for this to work? I tried setting those relationship fields to by Copy Fields but then you can't copy without including the traces. I'm using Integrity 10.7.
What we need is the best practice guide of the integrity SCM, not the user guideline. Are there any documents or materials related to the best practice of the integrity SCM?Thanks.
Hi ,I am looking for a configuration to run multiple integrity client session in one system at same time, it is very useful using Jenkins scripts. I need it for 10.5 version of integrity.RegardsSreedhar
Hi,I try to import a *.reqifz file with PTC Integrity Requirements Connector 3.1 but this operations has no successful.I attach the report that include the error message:Execution metadataPropertyValueResultErrorFile formatReqIF 1.1TypeImportDateWed Nov 16 10:58:22 CET 2016Tool namePTC IntegrityTool version(s)ExecutorAlessandro Il GrandeCommentExecution time00:00:00 sSuccessful documentsFailed documentsDocument pathDocument nameDocument IDOperation resultObject countChangesOperation time/projects/ProvaProvaError0-00:00:00 sLogs ProvaSeverityMessageErrorImport failed with exception 'java.lang.NullPointerException'.I don't have any idea to solve my problem. Do you have any suggestions?